Date | Orbit | Phase Angle | Maneuver Time (UTC) | VIIRS SDR/EDR Team Blog Notice | Event Timeline | Geolocation error | Evaluation Notes |
---|---|---|---|---|---|---|---|
2025-06-06 | 10:47:26 - 10:52:29z | SNPP VIIRS Lunar Calibration (No-Roll) | Maneuver Timeline: (UTC)
|
10:42 - 10:48 (inclusive) | |||
2025-05-07 | 23:27:44 - 23:40:45z | SNPP VIIRS Lunar Roll Maneuver (LRM) | Maneuver Timeline: (UTC)
|
Impacted Granules: 23:24 - 23:36 (inclusive) | |||
2025-04-08 | 07:06:28 - 07:13:29z | SNPP VIIRS Lunar Roll Maneuver (LRM) | Maneuver Timeline: (UTC)
|
Impacted Granules: 07:06, 07:12 | |||
2025-03-26 | 17:01:00z - 19:08:04z | SNPP VIIRS Drag Make Up Maneuver (DMU) 043 | Maneuver Timeline: (UTC)
|
Impacted Granules: 17:18 - 17:30 (inclusive) | |||
2025-03-09 | 08:02:37 - 08:07:40z | SNPP VIIRS Lunar Calibration (No-Roll) | Maneuver Timeline: (UTC)
|
08:00, 08:06 | SNPP VIIRS LRC was performed without sector rotation. L1 geolocation and L1b generated during this period were impacted. | ||
2025-02-08 | 00:17:40z - 00:22:43z | SNPP VIIRS Lunar Calibration (No-Roll) | Maneuver Timeline: (UTC)
|
||||
2025-01-09 | 21:38:28Z - 21:51:29z | SNPP VIIRS Lunar Roll Maneuver (LRM) | Maneuver Timeline: (UTC)
|
Impacted Granules: 21:42 | |||
2024-12-11 | 12:22:19Z - 12:35:20z | SNPP VIIRS Lunar Roll Maneuver (LRM) | Maneuver Timeline: (UTC)
|
Impacted Granules: 12:24 - 12:36 (inclusive) | |||
2024-11-20 | 17:57:00Zz - 20:04:04z | SNPP VIIRS Drag Make Up Maneuver (DMU) 042 | Maneuver Timeline: (UTC)
|
Impacted Granules: 18:12 to 18:24 (inclusive) | |||
2024-11-12 | 03:11:27z - 03:24:28z | SNPP VIIRS Lunar Roll Maneuver (LRM) | Maneuver Timeline: (UTC)
|
Impacted Granules: 03:12 - 03:18 (inclusive) | |||
2024-10-09 | 16:07:00z - 18:14:04z | SNPP VIIRS Drag Make Up Maneuver (DMU) 041 | Maneuver Timeline: (UTC)
|
Impacted Granules: 16:24 - 16:36z (inclusive) | |||
2024-06-20 | 18:05:04 - 18:12:04Z | SNPP VIIRS Drag Make Up Maneuver (DMU) 040 | Maneuver Timeline: (UTC)
|
Impacted Granules: 17:54 - 18:18z (inclusive) | |||
2024-05-19 | 00:09:42 - 00:16:43Z | VIIRS Lunar Roll Calibration Maneuver (LRM) | Timeline: (UTC)
|
||||
2024-04-19 | 06:06:48Z - 06:13:49Z | VIIRS Lunar Roll Calibration Maneuver (LRM) | Timeline: (UTC)
|
06:12 | |||
2024-03-06 | 17:04:00Z - 19:19:11Z | S-NPP Inclination Adjustment Maneuver (IAM) | Timeline: (UTC)
|
17:24 to 17:48 (inclusive) | |||
2024-01-21 | 07:05:41Z - 07:10:44Z | VIIRS Lunar Calibration No roll | Timeline: (UTC)
|
||||
2023-12-23 | 09:37:30- 09:42:33 | VIIRS Lunar Calibration (No Roll) Maneuver | Timeline: (UTC)
|
||||
2023-12-20 | 17:56:00 - 20:03:04 | SNPP Drag Make-up Maneuver (DMU) 039 | Timeline: (UTC)
|
Corrupt L1B geolocation: 18:12 - 18:24 (inclusive) | |||
2023-11-23 | 08:51:24 - 09:53:23 | VIIRS Lunar Calibration w/ Roll Maneuver | Timeline: (UTC)
|
Failed Granules: 09:12 - 09:18 inclusive | |||
2023-10-11 | 16:33:00 - 18:40:04 | SNPP Drag Make-up Maneuver (DMU) 038 | Timeline: (UTC)
|
Corrupt L1B geolocation: 16:48 - 17:00 (inclusive) | |||
2023-06-28 | 20:55:11 - 21:00:14 | VIIRS Lunar Calibration (No Roll) Maneuver | Timeline: (UTC)
|
||||
2023-06-21 | 17:03:00Z - 17:16:04z | VIIRS S-NPP Drag Makeup Maneuver (DMU) 037 | Timeline: (UTC)
|
Corrupt L1B geolocation: 17:00 - 17:18 (inclusive) | |||
2023-05-31 | 00:51:43 - 00:58:44 | VIIRS Lunar Calibration w/ Roll Maneuver | Timeline: (UTC)
|
||||
2023-05-08 | 08:44:00Z - 20:16:04Z | S-NPP Risk Mitigation Maneuver (RMM) | Timeline: (UTC)
|
09:00 to 09:12 (inclusive) | |||
2023-05-01 | 08:28:48 - 08:41:49 | VIIRS Lunar Calibration w/ Roll Maneuver | Timeline: (UTC)
|
Failed Granules: 08:30 | |||
2023-04-13 | 16:15:49Z - 18:33:51Z | VIIRS S-NPP Inclination Adjustment Maneuver (IAM) | Timeline: (UTC)
|
Corrupt L1B geolocation: 16:30 - 17:06 (inclusive) | |||
2023-04-01 | 12:49:22 - 12:54:25Z | VIIRS Lunar Calibration (No Roll) Maneuver | Timeline: (UTC)
|
||||
2023-03-02 | 00:58:56 - 01:03:59Z | VIIRS Lunar Calibration No roll | Timeline: (UTC)
|
||||
2023-03-01 | 16:34:00Z - 18:41:04z | VIIRS S-NPP Drag Makeup Maneuver (DMU) 036 | Timeline: (UTC)
|
Corrupt L1B geolocation: 16:54 - 17:06 (inclusive) | |||
2023-02-01 | 00:58:56 - 01:03:59Z | VIIRS Lunar Calibration No roll (Orbit 58362, #2 of 2) | Timeline: (UTC)
|
||||
2023-01-31 | 23:17:06Z - 23:22:09Z | VIIRS Lunar Calibration No roll (Orbit 58361, #1 of 2) | Timeline: (UTC)
|
||||
2023-01-02 | 05:06:10Z - 06:08:10Z | VIIRS Lunar Calibration w/ Roll Maneuver | Timeline: (UTC)
|
Failed Granules: 05:30 | |||
2022-12-03 | 16:51:09 - 17:03:09Z | VIIRS Lunar Calibration (roll maneuver) | Timeline: (UTC)
|
Failed Granule: 16:54 | |||
2022-12-02 | 15:56:00Z - 18:03:04Z | Risk Mitigation Maneuver (RMM) | Timeline: (UTC)
|
(16:12 to 16:30z inclusive) Geolocation team reviewed. | |||
2022-11-04 | 05:57:06 - 06:02:09 | VIIRS Lunar Calibration (no roll maneuver) | Timeline: (UTC)
|
||||
2022-06-10 | 15:22:21 - 15:27:24 | VIIRS Lunar Calibration (no roll maneuver) | Timeline: (UTC)
|
||||
2022-06-01 | 17:00:00Z - 19:07:04Z | VIIRS S-NPP Drag Makeup Maneuver (DMU) | Timeline: (UTC)
|
Corrupt L1B geolocation: 17:18 - 17:30 (inclusive) | |||
2022-05-12 | 05:44:30 - 05:57:31Z | VIIRS Lunar Calibration (roll maneuver) | Timeline: (UTC)
|
||||
2022-04-12 | 16:51:20 - 16:56:23Z | VIIRS Lunar Calibration (no roll maneuver) | Timeline: (UTC)
|
||||
2022-03-13 | 14:24:23 - 14:29:26Z | VIIRS Lunar Calibration (no roll maneuver) | Timeline: (UTC)
|
||||
2022-02-12 | 01:36:03 - 01:41:07Z | VIIRS Lunar Calibration (no roll maneuver) | Timeline: (UTC)
|
||||
2022-02-02 | 17:21:00 - 19:28:04Z | DMU #34 | Timeline: (UTC)
|
(17:36-17:54z inclusive) Geolocation team reviewed. | |||
2022-01-13 | 04:21:00 - 04:33:00Z | VIIRS Lunar Calibration w/ Roll Maneuver | Timeline: (UTC)
|
Failed Granules: 04:24 | |||
2021-12-14 | 08:58:59 - 09:10:59Z | VIIRS Lunar Calibration w/ Roll Maneuver | Timeline: (UTC)
|
Failed Granules: 09:00 | |||
2021-11-18 | 17:31:27z - 19:48:03z | VIIRS S-NPP Inclination Adjustment Maneuver (IAM) | Timeline: (UTC)
|
Corrupt L1B geolocation: 17:48 - 19:18 (inclusive) | |||
2021-11-14 | 18:42:38 - 18:48:38Z | VIIRS Lunar Calibration w/ Roll Maneuver | Timeline: (UTC)
|
||||
2021-10-14 | 02:11:00Z - 04:18:04Z | S-NPP Risk Mitigation Maneuver (RMM) | Timeline: (UTC)
|
Corrupt L1B geolocation: 02:36 | |||
2021-06-20 | 21:25:28 - 21:30:31Z | VIIRS Lunar Calibration (no roll maneuver) | Timeline: (UTC)
|
||||
2021-06-12 | 00:44:00Z- 02:51:04Z | S-NPP Risk Mitigation Maneuver (RMM) | Timeline: (UTC)
|
Corrupt L1B geolocation: 01:00 - 01:12 (inclusive) | |||
2021-05-22 | 18:36:45 - 18:43:46Z | VIIRS Lunar Calibration w/ Roll Maneuver | Timeline: (UTC)
|
||||
2021-04-29 | 16:40:00 - 16:53:04:00Z | DMU #33 | Timeline: (UTC)
|
Corrupt L1B geolocation: 16:36-16:48 (inclusive) | |||
2021-04-23 | 09:02:32 - 09:09:33Z | lunar calibration data collect (no roll maneuver) | Timeline: (UTC)
|
||||
2021-03-24 | 21:49:51 - 21:54:55Z | lunar calibration data collect (no roll maneuver) | Timeline: (UTC)
|
||||
2021-02-23 | 03:56:20Z - 04:01:24Z | VIIRS Lunar Calibration (No roll maneuver) | Timeline: (UTC)
|
||||
2021-01-24 | 08:20:18Z - 08:33:19Z | VIIRS Lunar Calibration w/ Roll Maneuver | Timeline: (UTC)
|
Failed Granules: 08:24 | |||
2020-12-25 | 11:12:46Z - 11:25:47Z | VIIRS Lunar Calibration w/ Roll Maneuver | Timeline: (UTC)
|
Failed Granules: 11:18 | |||
2020-12-10 | 16:54:00 Z - 17:07:04Z | DMU # 32 | Timeline: (UTC)
|
Corrupt L1B geolocation:: 16:54 - 17:06 (inclusive) | |||
2020-11-25 | 15:50:43Z - 16:03:44Z | VIIRS Lunar Calibration w/ Roll Maneuver | Timeline: (UTC)
|
Failed Granules: 15:54 | |||
2020-09-24 | 17:09Z - 19:25Z | VIIRS S-NPP Inclination Adjustment Maneuver (IAM) | Timeline: (UTC)
|
Corrupt L1B geolocation: 17:30 - 18:54 (inclusive) | |||
2020-06-24 | 16:36:00Z - 16:49:04Z | VIIRS S-NPP Drag Makeup Maneuver (DMU) | Timeline: (UTC)
|
Corrupt L1B geolocation: 16:36 - 16:48 (inclusive) | |||
2020-06-02 | 00:42:10Z - 00:47:14Z | S-NPP VIIRS Lunar Calibration (no Roll Maneuver) | Timeline: (UTC)
|
||||
2020-05-03 | 18:30:49Z - 18:37:50 Z | S-NPP VIIRS Lunar Calibration (no Roll Maneuver) | Timeline: (UTC)
|
||||
2020-04-04 | 10:41:50 Z - 10:46:54 Z | S-NPP VIIRS Lunar Calibration (no Roll Maneuver) | Timeline: (UTC)
|
||||
2020-03-05 | 21:49:51 Z - 21:49:55 Z | S-NPP VIIRS Lunar Calibration (no Roll Maneuver) | Timeline: (UTC)
|
||||
2020-02-05 | 09:00:47 Z - 09:07:48 Z | S-NPP VIIRS Lunar Calibration Roll Maneuver | Timeline: (UTC)
|
||||
2020-01-22 | 15:50:00 to 17:57:04z | VIIRS S-NPP Drag Makeup Maneuver (DMU) #30 | Timeline: (UTC)
|
Corrupt L1B geolocation: 16:06 - 16:18 (inclusive) | |||
2020-01-06 | 15:11:16 to 15:53:46z | VIIRS Lunar Calibration (with Roll Maneuver) | Timeline: (UTC)
|
Failed Granules: 15:12, 15:18 | |||
2019-12-07 | 19:48:28 to 20:01:29z | VIIRS Lunar Calibration (with Roll Maneuver) | Timeline: (UTC)
|
Failed Granules: 19:54 | |||
2019-11-07 | 22:44:35 to 22:49:39z | VIIRS Lunar Non-Roll Calibration | Timeline: (UTC)
|
||||
2019-09-26 | 16:13:45 to 16:51:50z | VIIRS Inclination Adjust Maneuver | Timeline: (UTC)
|
Corrupt L1B geolocation: 16:12 - 16:48 (inclusive) | |||
2019-06-13 | 03:23:49 to 03:28:53z | VIIRS Lunar Observation and Sector Rotation (no maneuver) | Timeline: (UTC)
|
||||
2019-05-14 | 21:10:55 - 21:23:54 | VIIRS Lunar Cal (with Roll Maneuver) | Timeline: (UTC)
|
Failed Granules: 21:12, 21:18 | |||
2019-04-15 | 16:46:07 - 16:51:11 | VIIRS Lunar Cal (without a roll) | Timeline: (UTC)
|
||||
2019-04-10 | 15:40:00 - 17:47:04 | DMU Maneuver | Timeline: (UTC)
|
Corrupt L1B geolocation: 16:00 - 16:12 (inclusive) | |||
2019-03-17 | 08:58:29 - 09:03:32 | VIIRS Lunar Calibration (Not Maneuver) | Instrument(s) Affected:VIIRS
Timeline: (UTC)
|
||||
2019-02-15 | 21:49:35 - 21:56:34 | Lunar Calibration Roll Maneuver | Instrument(s) Affected: ATMS, CERES, CrIS, OMPS, VIIRS
Timeline: (UTC)
|
||||
2019-01-17 | 09:02:31 - 09:15:30 | Lunar Calibration Roll Maneuver | Instrument(s) Affected: ATMS, CERES, CrIS, OMPS, VIIRS
Timeline: (UTC)
|
Failed Granules: 09:06 | |||
2018-12-18 | 18:22:31Z - 19:24:31Z | Lunar Calibration Maneuver | Instrument(s) Affected: All S-NPP Sensor
Details/Specifics of change: On December 18, 2018, S-NPP will perform a
spacecraft attitude maneuver for the VIIRS Lunar Calibration, with a
roll of -7.545 degrees centered at 18:47:31Z. Science data may be
impacted while the spacecraft is pointing off-nadir during the attitude
maneuver and the CERES instrument will not provide nominal science data
as it will placed in a contamination safe mode. The timeline of events
for this maneuver are provided below.
Timeline: (UTC)
|
Failed Granules: 18:48 | |||
2018-11-19 | 00:39:26 - 01:11:26 | Lunar Calibration Maneuver | Instrument(s) Affected: VIIRS
Timeline: (UTC)
|
Failed Granules: 01:00, 01:06 | |||
2018-10-28 | 19:06:00.0 - 19:19:04.0 | Risk Mitigation Maneuver | Timeline:
|
Corrupt L1B geolocation: 19:06 - 19:12 (inclusive) | |||
2018-09-27 | 16:39:12 - 17:09:23 | Inclination Adjustment Maneuver #8 | Instrument(s) Affected: ATMS, CERES, CrIS, OMPS, VIIRS
Timeline: (UTC)
|
Corrupt L1B geolocation: 16:36 - 17:06 (inclusive) | |||
2018-07-17 | 16:10:00 - 16:23:04 | Drag Make-Up Maneuver (DMU) #28 | Instrument(s) Affected: ATMS, CERES, CrIS, OMPS, VIIRS
Timeline: (UTC)
|
Geolocation errors (16:06 - 16:18) | |||
2018-06-23 | 12:50:19 - 12:55:23 | Lunar Calibration Maneuver | Instrument(s) Affected: VIIRS
Timeline: (UTC)
|
||||
2018-05-25 | 04:59:34 - 05:06:33 | Roll Maneuver | Instrument(s) Affected: ATMS, CERES, CrIS, OMPS, VIIRS
Timeline: (UTC)
|
Failed Granules: 05:00 | |||
2018-05-07 | 15:30 - 22:54 | Bus Flip | Timeline: (UTC)
|
Corrupt L1B geolocation: (15:30, 22:48) Failed Granules: 21:24 |
|||
2018-04-25 | 19:25:34 - 19:37:34 | Roll Maneuver | Instrument(s) Affected: ATMS, CERES, CrIS, OMPS, VIIRS
Timeline: (UTC)
|
Failed Granules: 19:30 | |||
2018-03-27 | 13:20:49 - 13:25:49 | Roll Maneuver | Instrument(s) Affected: VIIRS
Timeline: (UTC)
|
||||
2018-02-28 | 17:38:59 - 18:06:03 | Drag Make-Up Maneuver | Instrument(s) Affected: ATMS, CERES, CrIS, OMPS, VIIRS
Timeline: (UTC)
|
Corrupt L1B geolocation: 17:48-18:00 (inclusive) | |||
2018-02-26 | 05:29:10 - 05:45:10 | Roll Maneuver | Instrument(s) Affected: ATMS, CERES, CrIS, OMPS, VIIRS
Timeline: (UTC)
|
||||
2018-01-27 | 32396 | 20:07:45 - 20:20:46 | Roll maneuver | The lunar observation is centered at 20:13:15z.
During the sector rotation, the VIIRS calibrators and Earth view sectors data are
shifted to allow the Moon image to be captured in the middle of Earth view sector,
and the dual gain bands gain mode are switched from Auto Gain to fixed High Gain (HG).
|
Failed Granules: 20:12 | ||
2017-12-29 | 09:06 - 09:18 | Roll Maneuver for VIIRS Lunar Calibration | Instrument(s) Affected: ATMS, CERES, CrIS, OMPS, VIIRS
Timeline: (UTC)
|
Failed Granules: 09:12 |
|||
2017-11-29 | 20:09:55 - 21:11:55 | Lunar Calibration | Instrument(s) Affected: VIIRS
Timeline: (UTC)
|
Failed Granules: 20:30, 20:36 | |||
2017-10-31 | 06:09:31 - 06:14:35 | Lunar Calibration | Instrument(s) Affected: VIIRS
Timeline: (UTC)
|
||||
2017-09-28 | 16:44:46Z - 19:00:42Z | Inclination Adjustment Maneuver | On September 28, 2017 at 17:17:46Z, S-NPP performed a 116.0 second propulsive Inclination Adjustment Maneuver (IAM) to maintain Mean Local Time of the Ascending Node (MLTAN) while controlling Repeating Ground Track box.
The following observatory systems are affected on September 28, 2017.
|
Corrupt L1B geolocation: 17:00-17:30 (inclusive) | |||
2017-07-19 | 15:54 - 18:01:04 | Drag Make-Up Maneuver (DMU) #26 | Instrument(s) Affected: ATMS, CERES, CrIS, OMPS, VIIRS
Timeline: (UTC)
|
Corrupt L1B geolocation:: 16:12-16:24 (inclusive) | |||
2017-06-04 | 19:12 - 20:09Z | Roll Maneuver | On June 04, 2017, Suomi-NPP will perform a spacecraft attitude maneuver for the VIIRS Lunar Calibration, with a roll of -1.243 degrees centered at 19:35:24Z. Science data may be impacted while the spacecraft is pointing off-Nadir during the attitude maneuver and the CERES instrument will not provide nominal science data as it will placed in a contamination safe mode. The timeline of events for this maneuver are provided below.
The following observatory systems will be affected on 2017 June 04:
|
||||
2017-05-06 | 6:15:35 - 7:17:35 | Roll Maneuver | Instrument(s) Affected: ATMS, CERES, CrIS, OMPS, VIIRS Timeline: (UTC)
|
Failed Granules: 06:36, 06:42 | |||
2017-04-06 | 19:02:42 - 20:04:42 | Roll Maneuver | Instrument(s) Affected: ATMS, CERES, CrIS, OMPS, VIIRS
Timeline: (UTC)
|
Failed Granules: 19:24 | |||
2017-03-28 | 18:02:00 - 18:29:06 | Drag Make-up Maneuver | Instrument(s) Affected: ATMS, CrIS, OMPS, VIIRS (HRD OFF during non-nominal pointing)
Timeline: (UTC)
|
Corrupt L1B geolocation: 18:18 | |||
2017-03-08 | 09:36 - 10:32 | Roll Maneuver | Instrument(s) Affected: All Suomi-NPP Sensor Data
Details/Specifics of Change: * On March 08, 2017, Suomi-NPP will perform a spacecraft attitude maneuver for the VIIRS Lunar Calibration, with a roll of -1.8989 degrees centered at 09:59:09Z. Science data may be impacted while the spacecraft is pointing off-nadir during the attitude maneuver and the CERES instrument will not provide nominal science data as it will placed in a contamination safe mode.The timeline of events for this maneuver are provided below. The following observatory systems are affected:
|
||||
2017-02-07 | 00:08 - 01:11 | Roll Maneuver | Instrument(s) Affected: All Suomi-NPP Sensor Data
Details/Specifics of change:* On February 07, 2017, Suomi-NPP will perform a spacecraft attitude maneuver for the VIIRS Lunar Calibration, with a roll of -3.794 degrees centered at 00:33:30Z. Science data may be impacted while the spacecraft is pointing off-nadir during the attitude maneuver and the CERES instrument will not provide nominal science data as it will placed in a contamination safe mode. The timeline of events for this maneuver are provided below. The following observatory systems will be affected on 2017 February 07:
|
Failed Granules: 00:30 | |||
2017-01-08 | 18:10:09 - 19:12:09 (UTC) | Roll Maneuver | Instrument(s) Affected: ATMS, CERES, CrIS, OMPS, VIIRS
Timeline: (UTC)
|
Failed Granules: 18:30, 18:36 | |||
2016-12-10 | 07:31:58 Z - 07:43:58 Z | Roll Maneuver | On December 10, 2016, Suomi-NPP performed a spacecraft attitude maneuver for the VIIRS Lunar Calibration, with a roll of -7.6607 degrees centered at 07:36:58Z. Science data may be impacted while the spacecraft is pointing off-nadir during the attitude maneuver and the CERES instrument will not provide nominal science data as it will placed in a contamination safe mode. The timeline of events for this maneuver are provided below.
The following observatory systems are affected on 2016 December 10:
|
Failed Granules: 07:36 | |||
2016-11-10 | 20:33:56 - 20:45:56 | Roll Maneuver | Time line:
|
Failed Granules: 20:36 | |||
2016-09-29 | 17:10:26 - 19:25:40 | Inclination maneuver | Closed-Loop Inclination Adjustment Maneuver (IAM) #6 to maintain MLTAN
|
Corrupt L1B geolocation: 17:30 - 19:06 (inclusive) | |||
2016-09-13 | 16:05 - 16:19 | DMU | Corrupt L1B geolocation: 16:06 - 16:18 (inclusive) | ||||
2016-08-09 | 15:53 - 16:06 | DMU | Corrupt L1B geolocation: 15:54 - 16:00 (inclusive) | ||||
2016-06-15 | 18:33-18:38Z | Lunar Calibration Roll Maneuver | Suomi-NPP performs a VIIRS Lunar Calibration on June 15, 2016 centered at 18:36:12 UTC. VIIRS Science data will be impacted during the calibration. The timeline of events for this maneuver are provided below. The next Lunar Calibration will not occur until October 2016.
The following observatory systems will be affected on 2016 June 15:
|
||||
2016-05-17 | 3:36:05 - 4:38:05 (UTC) | Roll Maneuver | Roll Maneuver (-2.6395°) for VIIRS Lunar Calibration (9-10 times per year)
Instrument(s) Affected: ATMS, CERES, CrIS, OMPS, VIIRS
|
Failed Granules: 04:00 | |||
2016-04-17 | 11:18 - 12:20Z | Lunar Roll Maneuver | On April 17, 2016, Suomi-NPP performed a spacecraft attitude maneuver for the VIIRS Lunar Calibration, with a roll of -3.6343 degrees centered at 11:43:12Z. Science data may be impacted while the spacecraft is pointing off-nadir during the attitude maneuver and the CERES instrument will not provide nominal science data as it will placed in a contamination safe mode. The timeline of events for this maneuver are provided below.
The following observatory systems will be affected on April 17, 2016:
|
Failed Granules: 11:42 | |||
2016-03-24 | 16:50 - 17:05 | Drag Make-up Maneuver | Drag Make-Up Maneuver (DMU) #23.
|
Corrupt L1B geolocation: 16:48-17:00 (inclusive) | |||
2016-03-18 | 20:43:23 - 21:45:23 UTC | Roll Maneuver | Roll maneuver (-2.8601) for VIIRS Lunar Calibration (centered at 21:08:23 UTC).
|
Failed Granules: 21:06 | |||
2016-02-24 | 17:21 - 17:49:04 | Drag Make-up Maneuver | Drag Make-Up Maneuver (DMU) #22. Orbit Correction was executed successfully.
|
Corrupt L1B geolocation: 17:30-17:42 (inclusive) | |||
2016-02-18 | 07:53:15 - 08:55:15Z | Lunar Calibration Roll Maneuver | Details/Specifics of Change: On February 18, 2016, Suomi-NPP will perform a spacecraft attitude maneuver for the VIIRS Lunar Calibration, with a roll of -3.3312 degrees centered at 08:18:15Z. Science data may be impacted while the spacecraft is pointing off-nadir during the attitude maneuver and the CERES instrument will not provide nominal science data as it will placed in a contamination safe mode.
The timeline of events for this maneuver are provided below. The following observatory systems will be affected on 2016 February 18:
|
Failed Granules: 08:18 | |||
2016-01-19 | 22:49:15 - 23:02:16z | Roll maneuver | The S-NPP is scheduled to perform a roll maneuver (-5.3022 deg) on Jan 19, 2016 for
VIIRS lunar calibration in orbit# 21913 with VIIRS sector rotation (encoder offset).
The lunar observation is centered at 22:54:45z.
During the sector rotation, the VIIRS calibrators and Earth view sectors data are
shifted to allow the Moon image to be captured in the middle of Earth view sector, and
the dual gain bands gain mode will be switched from Auto Gain to fixed High Gain (HG).
|
Failed Granules: 22:54 | |||
2015-12-21 | 13:10Z - 14:12Z | Lunar Calibration Roll Maneuver | Details/Specifics of Change: Suomi-NPP performed a spacecraft attitude maneuver, for the VIIRS Lunar Calibration, with a roll of -8.1760 degrees, centered at 2015-12-21T13:35:44 UTC. Science data may be impacted while the spacecraft is pointing off-nadir during the attitude maneuver and the CERES instrument will not provide nominal science data as it will placed in a contamination safe mode. The timeline of events for this maneuver are provided below.
The following observatory systems will be affected on 2015 December 21:
|
Failed Granules: 13:36 | |||
2015-11-22 | 04:15:25Z - 04:27:25Z | Lunar Roll Maneuver | The following observatory systems were affected on 2015
November 22:
04:12, 04:24- Corrupt M13 values, all QF OK, ignore. |
Failed Granules: 04:18 | |||
2015-11-05 | 23:40:00 - 23:53:01 | Risk avoidance maneuver (RMM) | Collision avoidance maneuver executed 05 Nov, ~23:46:00UT for 0.5 sec burn
for space debris
Maneuver extended from 23:40:00 to 23:53:01 |
Corrupt L1B geolocation: 23:36 - 23:48 (inclusive) | |||
2015-10-23 | 18:59:24 - 19:05:24 UTC | Lunar Roll Maneuver | 7 min VIIRS SDRs/EDRs impacted period: 18:58:54 - 19:05:55z (sector rotation and HG)
6 min S-NPP spacecraft pointing off nadir: 18:59:24 - 19:05:24z (maneuver) |
||||
2015-09-23 | 16:47 - 19:03 UTC | IAM#5 | Suomi-NPP performed an out-of-plane maneuvers to adjust the Mean Local Time of Ascending Node (MLTAN) on Wednesday, September 23, 2015 at 17:20:49z.
The following observatory systems are affected on September 23, 2015:
|
Corrupt L1B geolocation: 17:06 - 18:48 (inclusive) | |||
2015-06-27 | 14:14:39 - 14:19:42 UTC | Lunar Calibration Roll Maneuver | Suomi-NPP will perform a VIIRS Lunar Calibration on June 27, 2015 centered at 14:17:10 UTC. VIIRS Science data will be impacted during the calibration.
Impact: 14:14:39 UTC - 14:19:42 UTC VIIRS encoder offset and gain will be set for moon observation Site/Spacecraft Affected: SNPP - VIIRS Science Date/Time Start: 2015-06-27 T14:14:39 UTC Date/Time Stop: 2015-06-27 T14:19:42 UTC Duration: See Impact 1412 - Corrupt M13 values, all QF OK, ignore. Granule 14:12 - Corrupt M13 values, all QF OK. |
||||
2015-05-29 | 18569 | 04:44:10 - 04:50:10z | Roll Manuever | The S-NPP is scheduled to perform a roll maneuver (-2.306 deg) on May 29, 2015 for
VIIRS lunar calibration in orbit# 18569 with VIIRS sector rotation (encoder offset).
The lunar observation is centered at 04:47:10z.
During the sector rotation, the VIIRS calibrators and Earth view sectors data are shifted to allow the Moon image to be captured in the middle of Earth view sector, and the dual gain bands gain mode will be switched from Auto Gain to fixed High Gain (HG).
|
|||
2015-04-30 | 18:03:00 - 18:26:03 UTC | Drag Make-up (DMU) Maneuver #21 | On 04/30/2015, SNPP performed a critical DMU maneuver to maintain repeating ground track. The propulsive burn lasted 2 seconds. The associated timeline and impacts to observatory components is as follows.
|
Corrupt L1B geolocation: 18:06 - 18:18 (inclusive) | |||
2015-04-29 | 18148 | 12:23:57 - 12:36:58z | The S-NPP is scheduled to perform a roll maneuver (-4.701 deg) on Apr 29, 2015 for
VIIRS lunar calibration in orbit# 18148 with VIIRS sector rotation (encoder offset).
The lunar observation is centered at 12:29:27z.
During the sector rotation, the VIIRS calibrators and Earth view sectors data are shifted to allow the Moon image to be captured in the middle of Earth view sector, and the dual gain bands gain mode will be switched from Auto Gain to fixed High Gain (HG). 13 min VIIRS SDRs/EDRs impacted period: 12:23:57 - 12:36:58z (sector rotation and HG). 12 min S-NPP spacecraft pointing off nadir: 12:24:27 - 12:36:27z (maneuver). |
Failed Granules: 12:24, 12:30 | |||
2015-03-30 | 17724 | 16:43:37 - 16:56:38 UTC | S-NPP Lunar Roll Maneuver and VIIRS sector rotation 3/30/15 orbit 17724 from 16:43:37 to 16:56:38z
The S-NPP is scheduled to perform a roll maneuver (-5.238 deg) on Mar 30, 2015 for VIIRS lunar calibration in orbit# 17724 with VIIRS sector rotation (encoder offset). The lunar observation is centered at 16:49:07z. During the sector rotation, the VIIRS calibrators and Earth view sectors data are shifted to allow the Moon image to be captured in the middle of Earth view sector, and the dual gain bands gain mode will be switched from Auto Gain to fixed High Gain (HG). 13 min VIIRS SDRs/EDRs impacted period: 16:43:37 - 16:56:38z (sector rotation and HG). 12 min S-NPP spacecraft pointing off nadir: 16:44:07 - 16:56:07z (maneuver). 16:42, 16:54 - Corrupt M13 values, all QF OK, ignore. |
Failed Granules: 16:48 | |||
2015-03-01 | 17303 | 00:28:52 - 00:41:53 UTC | Lunar Calibration
Subject: S-NPP Lunar Roll Maneuver and VIIRS sector rotation 3/1/15 orbit 17303 from 00:28:52 to 00:41:53z The S-NPP is scheduled to perform a roll maneuver (-4.048 deg) on Mar 1, 2015 for VIIRS lunar calibration in orbit# 17303 with VIIRS sector rotation (encoder offset). The lunar observation is centered at 00:34:22z. During the sector rotation, the VIIRS calibrators and Earth view sectors data are shifted to allow the Moon image to be captured in the middle of Earth view sector, and the dual gain bands gain mode will be switched from Auto Gain to fixed High Gain (HG). 13 min VIIRS SDRs/EDRs impacted period: 00:28:52 - 00:41:53z (sector rotation and HG). 12 min geolocation pointing off nadir: 00:29:22 - 00:41:22z (maneuver). |
Details/Specifics of Change: Suomi-NPP will perform a spacecraft attitude maneuver, for the VIIRS Lunar Calibration, with a roll of -4.048 degrees centered at 2015-03-01T00:34:22 UTC. Science data may be impacted while the spacecraft is pointing off-nadir during the attitude maneuver and the CERES instrument will not provide nominal science data as it will placed in a contamination safe mode. The timeline of events for this maneuver are provided below.
The following observatory systems will be affected on 2015 March 1:
|
Failed Granules: 00:30, 00:36 | ||
2015-02-04 | 17:33:59 - 19:41:01 UTC | Drag Make-Up Maneuver DMU #20 | Details/Specifics of Change: On Wednesday, February 4, 2015 at 17:59:59 UTC Suomi-NPP will perform a critical Drag Make-Up (DMU) Maneuver to maintain repeating ground track. The propulsive burn will last 2 seconds.
Impact:
|
Corrupt L1B geolocation: 17:54 - 18:00 (inclusive) | |||
2015-01-30 | 16882 | 8:16:44 - 8:29:45 UTC | Lunar Calibration Maneuver | Description_Title: OPEN - S-NPP VIIRS Lunar Calibration 2015-01-30
MN_ID: MN022540
Date_Time: 2015-01-28 18:28:24
Mission_Notice_Text: Mission Notice Status: OPEN
Description: S-NPP will perform a spacecraft attitude maneuver for VIIRS Lunar Calibration;
a roll of -5.674 degrees, centered at 2015-01-30T08:22:14 UTC.
Impact:
Date/Time Start: 2015-01-30 T08:17:14 UTC Date/Time Stop: 2015-01-30 T08:29:14 UTC Duration: See Impact 08:12, 0824 - Corrupt M13 values, all QF OK. |
Failed Granules: 08:18 | ||
2014-12-31 | 19:13:08 - 20:15:08 UTC | Lunar Roll Maneuver | Details/Specifics of Change: Suomi-NPP will perform a spacecraft attitude maneuver, for the VIIRS Lunar Calibration, with a roll of -8.982 degrees centered at 2014-12-31T19:38:08 UTC. Science data may be impacted while the spacecraft is pointing off-nadir during the attitude maneuver and the CERES instrument will not provide nominal science data as it will placed in a contamination safe mode. The timeline of events for this maneuver are provided below.
The following observatory systems will be affected on 2014 December 31:
|
Failed Granules: 19:36 | |||
2014-12-02 | 16046 | 8:36:14 - 8:49:15 UTC | Lunar Roll Maneuver | The S-NPP performed a roll maneuver (-10.841 deg) on Dec 2 for VIIRS
lunar calibration in orbit# 16046 with VIIRS sector rotation (encoder offset) to allow
the Moon image to be captured in the middle of Earth view sector (target time 8:41:44z).
During the sector rotation, the VIIRS calibrators and Earth view sectors data are shifted and the dual gain bands are set from Auto Gain mode to fixed High Gain (HG) mode. 13 min VIIRS SDRs/EDRs impacted period: 8:36:14 - 8:49:15z (sector rotation and HG). 12 min geolocation pointing off nadir: 8:36:44 - 8:48:44z (maneuver). Granules 08:36, 08:48 corrupt M13 values, all QF ok. |
Failed Granules: 08:42 | ||
2014-11-12 | 16:54 - 19:10 UTC | IAM#4 | Details/Specifics of Change: On Wednesday, November 12, 2014 at 17:26:58 UTC Suomi-NPP will perform the fourth of a series of critical out-of-plane maneuvers to maintain a mean local time requirement.
Impact:
|
Corrupt L1B geolocation: 17:12 - 18:54 (inclusive) | |||
2014-11-03 | 00:42:34 - 01:14:34 UTC | Lunar Roll Maneuver | Suomi-NPP will perform a spacecraft attitude maneuver, for the VIIRS Lunar Calibration, with a roll of -6.090 degrees centered at November 3, 2014 01:07:34 UTC. Science data may be impacted during the attitude maneuver and the CERES instrument will not provide nominal science data as it will be placed in a contamination safe mode. The timeline of events for this maneuver are provided below.
The following observatory systems will be affected on November 3, 2014:
|
Failed Granules: 01:06 | |||
2014-10-30 | 16:12:59-18:20:01 UTC | Drag Make-Up Maneuver DMU #19 | On Thursday, October 30, 2014 at 16:38:59 UTC Suomi-NPP perform a critical Drag Make-Up (DMU) Maneuver to maintain repeating ground track. The propulsive burn will last 2 seconds.
The following observatory systems will be affected on October 30, 2014:
|
Corrupt L1B geolocation: 16:30 - 16:42 (inclusive) | |||
2014-10-15 | 17:21:46 UTC - 20:00:00 UTC | IAM #3 | October 15, 2014 at 17:54:46 UTC Suomi-NPP performed the third of a series of critical out-of-plane maneuvers to maintain a mean local time requirement.
The following observatory systems will be affected on October 15, 2014:
|
Corrupt L1B geolocation: 17:36 - 20:12 (inclusive) | |||
2014-10-04 | 17:26:54 UTC - 17:31:26 UTC | VIIRS Lunar Calibration, no-roll calibration / only sector rotation | The following observatory systems will be affected on October 4, 2014:
|
||||
2014-09-29 | T21:01:38 UTC - T23:08:39 UTC | Risk Mitigation Maneuver | Impact: SNPP requires a Risk Mitigation Maneuver.
Site/Spacecraft Affected: SNPP Date/Time Start: 2014-09-29 T21:01:38 UTC Date/Time Stop: 2014-09-29 T23:08:39 UTC Duration: Two hours and seven minutes Details: On Monday, September 29, 2014 at 21:27:38 UTC Suomi-NPP will perform a critical Risk Mitigation Maneuver. The propulsive burn will last 1 second. The following observatory systems will be affected on September 29, 2014:
|
Corrupt L1B geolocation: 21:18 - 21:30 (inclusive) | |||
2014-09-10 | 18:40:35 - 21:00:00 | IAM#2 | Product(s) or Data Impacted: All Suomi-NPP Sensor Data
Date/Time of Initial Impact: September 10, 2014 1821 UTC Date/Time of Expected End: September 10, 2014 2037 UTC Length of Outage: See Details Details/Specifics of Change: On Wednesday, September 10, 2014 at 18:54:35 UTC Suomi-NPP will perform the second of a series of critical mandatory out-of-plane maneuvers to maintain a mean local time requirement. The following observatory systems will be affected on September 10, 2014:
|
Corrupt L1B geolocation: 18:36 - 20:24 (inclusive) | |||
2014-08-08 | 14:13:00 - 18:48:42 | DMU#18 | Due to solar array vibe --> S-NPP entered Earth Safe mode, VIIRS entered Safe Hold @14:21:02 until 18:48:42z. |
Corrupt L1B geolocation: 14:12 - 18:42 (inclusive) Failed Granules: 14:24 through 18:42 |
|||
2014-07-30 | 21:54:20 UTC - 22:19:28 UTC | Inclination Adjustment Maneuver (1) | UPDATE #1: The primary burn opportunity was not executed due to loss of communication prior to activating the burn. Data impacts detailed for the primary burn are still valid. A secondary opportunity will be executed with a burn time of 22:07:20 UTC. The following observatory systems will be affected on July 30, 2014 for the secondary burn opportunity:
Product(s) or Data Impacted: All Suomi-NPP Sensor Data
Length of Outage: See Details The following observatory systems will be affected on July 30, 2014:
|
Corrupt L1B geolocation: 21:54 - 23:36 (inclusive) | |||
2014-07-30 | 18:30:00- 22:20 | Lunar Calibration Roll Maneuver | 2014-07-30 18:30 to 2014-07-30 19:00 18:30 Geolocation errors, Reflectance corrupt 18:36 - 18:48. Scan QF and band QF all report 0, corrupt granules are not flagged. |
Corrupt L1B geolocation: 18:30-18:54 (inclusive) | |||
2014-07-01 | 17:40:00- 17:53:42 | DMU#17 | DMU#17: 17:40:00- 17:53:42 |
Corrupt L1B geolocation: 17:36 - 17:54 (inclusive) | |||
2014-06-09 | 03:46:27 UTC - 03:50:58 UTC | Lunar Calibration | Description: Suomi-NPP will perform a VIIRS Lunar Calibration on June 9, 2014 at 03:48:42 UTC. VIIRS Science data will be impacted during the calibration.
Impact: 03:46:27 UTC - 03:50:58 UTC VIIRS encoder offset and gain will be set for moon observation Site/Spacecraft Affected: SNPP - VIIRS Science Date/Time Start: 2014-06-09 T03:46:27 UTC Date/Time Stop: 2014-06-09 T03:50:58 UTC Duration: 03:46:27 UTC - 03:50:58 UTC |
||||
2014-05-10 | 12:48:00 UTC - 13:50:00 UTC | Lunar Calibration | Description: S-NPP will perform a spacecraft attitude maneuver for VIIRS Lunar Calibration;
a roll of -4.178 degrees, centered at 2014-05-10T13:13:00 UTC.
Impact: 12:48:00 UTC - 13:50:00 UTC CERES will be in Contam-Safe 13:03:00 UTC - 13:25:00 UTC HRD will be off 13:07:30 UTC - 13:20:31 UTC VIIRS encoder offset and gain will be set for moon observation 13:08:00 UTC - 13:20:00 UTC SNPP will be pointing off nadir Site/Spacecraft Affected: SNPP - All Science Data Effected Date/Time Start: 2014-05-10 T12:48:00 UTC Date/Time Stop: 2014-05-10 T13:50:00 UTC Duration: See Impact |
Failed Granules: 13:12 | |||
2014-04-10 | 20:28:16 UTC - 21:30:16 UTC | Lunar Calibration | Description: S-NPP will perform a spacecraft attitude maneuver for VIIRS Lunar Calibration; a roll of -4.976 degrees, centered at 2014-04-10T20:53:16 UTC.
Impact: 20:28:16 UTC - 21:30:16 UTC CERES will be in Contam-Safe 20:43:16 UTC - 21:05:16 UTC HRD will be off 20:47:45 UTC - 21:00:47 UTC VIIRS encoder offset and gain will be set for moon observation 20:48:16 UTC - 21:00:16 UTC SNPP will be pointing off nadir Site/Spacecraft Affected: SNPP - All Science Data Effected Date/Time Start: 2014-04-10 T20:28:16 UTC Date/Time Stop: 2014-04-10 T21:30:16 UTC Duration: One Hour and Two Minutes |
Failed Granules: 20:48, 20:54 | |||
2014-03-12 | 17:23 - 17:34 | DMU#16 | DMU#16: 17:23:00 - 17:34:58 |
Corrupt L1B geolocation: 17:24 - 17:30 (inclusive) | |||
2014-03-12 | 00:46:43-01:48:43 | Lunar Calibration | Description: S-NPP will perform a spacecraft attitude maneuver for VIIRS Lunar Calibration; a roll of -3.945 degrees, centered at 2014-03-12T01:11:43 UTC.
Impact: 00:46:43 UTC . 01:48:43 UTC CERES will be in Contam-Safe 01:01:43 UTC . 01:23:43 UTC HRD will be off 01:06:13 UTC . 01:19:14 UTC VIIRS encoder offset and gain will be set for moon observation 01:06:43 UTC . 01:18:43 UTC SNPP will be pointing off nadir Site/Spacecraft Affected: SNPP - All Science Data Effected Date/Time Start: 2014-03-12 T00:46:43 UTC Date/Time Stop: 2014-03-12 T01:48:43 UTC Duration: One hour and two minutes 01:06, 01:18 - Corrupt M13 values, all QF OK |
Failed Granules: 01:12 | |||
2014-03-04 | 8 Yaws Maneuver | Operated in OPS mode Start/End Slew: 7:31:06/7:42:16 Start/End Dwell: 7:32:06/7:41:16 Start/End Slew: 9:12:37/9:23:47 Start/End Dwell: 9:13:37/9:22:47 Start/End Slew: 10:54:07/11:05:17 Start/End Dwell: 10:55:07/11:04:17 Start/End Slew: 12:35:38/12:46:48 Start/End Dwell: 12:36:38/12:45:48 Start/End Slew: 14:17:08/14:28:18 Start/End Dwell: 14:18:08/14:27:18 Start/End Slew: 15:58:38/16:09:48 Start/End Dwell: 15;59:38/16:08:48 Start/End Slew: 17:47:59/17:55:29 Start/End Dwell: 17:48:59/17:54:29 Start/End Slew: 19:29:29/19:36:59 Start/End Dwell: 19:30:29/19:35:59 |
|||||
2014-02-20 | 18:15:34-18:59:19 | Pitch Back Flip | |||||
2014-02-10 | 05:09:12-05:41:12 | Lunar Calibration | 3 min VIIRS SDRs/EDRs impacted period: 5:28:42 - 5:41:43z (sector rotation and HG). 12 min geolocation pointing off nadir: 5:29:12 - 5:41:12z (maneuver). 05:36 - Corrupt M13 values, all QF OK |
Failed Granules: 05:30 | |||
2014-01-21 | 2014-01-21 20:48:20 | Risk Mitigation Maneuver | Product(s) or Data Impacted: All SNPP SMD data may be degraded if this
maneuver is actually executed. No data should be lost Date/Time Start: January 21, 2014 approx. 1930 UTC Date/Time End: January 21, 2014 approx. 2030 UTC Length of Event: 60 minutes Details/Specifics of Change This notice is designed to forewarn SNPP SMD Data users that the SNPP Observatory may have to perform an RMM at the time specified above. If the RMM is executed SMD data will be degraded as the S/C will be off nominal pointing. |
Corrupt L1B geolocation: 19:36 - 19:48 (inclusive) | |||
2014-01-11 | 2014-01-11T09:59:45 UTC | Lunar Calibration | 09:34:45 UTC - 11:47:45 UTC CERES will be in Contam-Safe 09:49:45 UTC - 10:11:45 UTC HRD will be off 09:54:15 UTC - 10:07:16 UTC VIIRS encoder offset and gain will be set for moon observation 09:54:45 UTC - 10:06:45 UTC SNPP will be pointing off nadir Site/Spacecraft Affected: SNPP - All Science Data Effected Date/Time Start: 2014-01-11 T09:34:45 UTC Date/Time Stop: 2014-01-11 T11:47:45 UTC Duration: Two hours and thirteen minutes 09:54 - Corrupt M13 values, all QF OK |
Failed Granules: 10:00 | |||
2013-12-12 | 19:35:46-21:23:46 UTC | Lunar Calibration | 19:25:46z - 21:23:46z CERES will be in Contam-Safe 19:25:46z - 19:47:46z HRD will be off 19:30:15z - 19:43:17z VIIRS encoder offset and gain will be set for moon observation 19:30:46z - 19:42:46z SNPP will be pointing off nadir Site/Spacecraft Affected: SNPP - All Science Data Effected Date/Time Start: 2013-12-12 T19:25:46 UTC Date/Time Stop: 2013-12-12 T21:23:46 UTC Duration: One hour and Fifty-Eight minutes 19:30 - Corrupt M13 values, all QF OK. |
Failed Granules: 19:36 | |||
2013-11-29 | 17:33:01 - 17:44: | DMU#15 | DMU#15 |
Corrupt L1B geolocation: 17:30-17:42 (inclusive) | |||
2013-11-13 | 10597 | 6:52:11 - 7:05:12z | Roll Manuever | 13 min VIIRS SDRs/EDRs impacted period: 6:52:11 - 7:05:12z (sector rotation) 12 min geolocation pointing off nadir: 6:52:41 - 7:04:41z (maneuver) 06:48 - Corrupt M13 values, all QF OK. |
Failed Granules: 06:54 | ||
2013-10-14 | 21:16:19-23:23:19 | Lunar Maneuver | SNPP will perform a spacecraft attitude maneuver for VIIRS Lunar Calibration
21:16:19 UTC . 23:23:19 UTC CERES will be in Contam-Safe 21:31:19 UTC . 21:47:19 UTC HRD will be off 21:35:49 UTC . 21:42:50 UTC VIIRS encoder offset and gain will be set for moon observation 21:36:19 UTC . 21:42:19 UTC SNPP will be pointing off nadir Site/Spacecraft Affected: SNPP Date/Time Start: 2013-10-14T21:16:19 UTC Date/Time Stop: 2013-10-14T23:23:19 UTC |
Failed Granules: 21:36 | |||
2013-07-16 | 18:31:00-20:43:04 | Routine Drag Make-Up Maneuver (DMU 14). | CERES and OMPS out of science modes.
Date/Time Start: 2013-07-16T18:31:00 UTC Date/Time Stop : 2013-07-16T20:43:04 UTC Duration: 2 Hours and 12 Minutes |
Corrupt L1B geolocation: 18:48-19:00 (inclusive) | |||
2013-05-21 | 8101 | 50.67 | The VIIRS is scheduled to perform sector rotation for lunar observation in orbit 8101
on May 21st. This operation activity allows the Moon image to be captured in the middle
of Earth data sector (target time at 8:43:15z). Roll maneuver is not required this time.
During the sector rotation, the VIIRS calibrators and Earth view data sectors are shifted, and the dual gain bands are set to fixed gain mode at High Gain (HG) state. Time period of SDRs/EDRs impacted by this activity: 8:41:00 to 8:45:31z (sector rotation). |
May VIIRS Lunar Cal Sector Rotation and fixed High Gain. 8:41:00 VIIRS Encoder Offset Shift to 26790 8:41:01 VIIRS Gain to Fixed High Gain 8:41:15 Start 4 min dwell 8:43:15 Center of Dwell - targeted time 8:45:15 End dwell 8:45:29 VIIRS Encoder Offset back to 0 8:45:31 VIIRS Gain back to Auto Gain (No Roll needed) 08:36 - Corrupt M13 values, all QF OK. |
|||
2013-04-21 | 7682 | 50.83 | 19:42:54 - 19:54:54 | The NPP is scheduled to perform a roll maneuver (-3.8818 deg) on April 21st
for VIIRS lunar calibration in orbit 7682 with VIIRS sector rotation
(encoder offset) to allow the Moon image to be captured in the middle of
Earth view sector (target time 19:47:54z).
During the sector rotation, the VIIRS calibrators and Earth view sectors data are shifted and the dual gain bands will be set to fixed gain mode at High Gain state. 13 min sector rotation, SDRs/EDRs impacted by this activity: 19:42:24 - 19:55:25z. 12 min maneuver, spacecraft geolocation pointing off nadir: 19:42:54 - 19:54:54z. |
April Lunar Roll Maneuver-VIIRS Lunar Cal Roll with Sector Rotation and fixed High Gain. 19:42:24 VIIRS Encoder Offset Shift to 26790 19:42:25 VIIRS Gain to Fixed High Gain 19:42:54 Maneuver (Roll) to -3.8818 deg attitude, 180 seconds 19:45:54 End maneuver; Start 4 min dwell 19:47:54 Center of Dwell - Targetted roll angle time 19:49:54 Maneuver to Nadir attitude, 300 seconds 19:54:54 End maneuver 19:55:23 VIIRS Encoder Offset back to 0 19:55:25 VIIRS Gain back to Auto Gain |
Failed Granules: 19:48 | |
2013-03-23 | 03:04:00 - 05:17:00 | NPP will perform a spacecraft attitude maneuver for VIIRS Lunar Calibration;
a roll of -3.3196 degrees, centered at 2013-03-23T03:29:00z. Impact: 03:04:00z - 05:17:00z CERES will be in Contam-Safe 03:19:00z - 03:41:00z HRD will be off 03:23:30z - 03:36:31z VIIRS encoder offset and gain will be set for moon observation 03:24:00z - 03:36:00z NPP will be pointing off nadir Site/Spacecraft Affected: NPP - All Science Data Effected Date/Time Start: 2013-03-23 03:04:00z Date/Time Stop: 2013-03-23 05:17:00z Duration: two hours and thirteen minutes |
Failed Granules: 03:24, 03:30 | ||||
2013-02-24 | 11:14 - 11:28 | NPP Risk Mitigation Maneuver | 17:31:00-17:44:04z NPP pointing off-nadir |
Corrupt L1B geolocation: 11:12-11:24 (inclusive) | |||
2013-02-21 | 6838 | 50.71 | 9:28:25 - 9:34:25 | The NPP is scheduled to perform a roll maneuver (-1.7121 deg) on February 21st for VIIRS lunar calibration in orbit 6838 with VIIRS sector rotation (encoder offset) to allow the Moon image to be captured in the middle of Earth view sector (target time 9:31:25z).
During the sector rotation, the VIIRS calibrators and Earth view sectors data are shifted and the dual gain bands will be set to fixed gain mode at High Gain state. 7 min SDRs/EDRs impacted by this activity: 9:27:55 - 9:34:56z (sector rotation). 6 min geolocation pointing off nadir: 9:28:25 - 9:34:25z (maneuver). |
February Lunar Roll Maneuver-VIIRS Lunar Cal Roll with Sector Rotation and fixed High Gain. 9:27:55 VIIRS Encoder Offset Shift to 26790 (S/C DAS) 9:27:56 VIIRS Gain to Fixed High Gain (S/C DAS) 9:28:25 Maneuver (Roll) to -1.7121 deg attitude, 60 seconds 9:29:25 End maneuver; Start 4 min dwell 9:31:25 Center of Dwell - Targetted roll angle time 9:33:25 Maneuver to Nadir attitude, 60 seconds 9:34:25 End maneuver 9:34:54 VIIRS Encoder Offset back to 0 (S/C DAS) 9:34:56 VIIRS Gain back to Auto Gain (S/C DAS) |
  | |
2013-01-22 | 6414 | 50.81 | 12:08:35 - 12:20:35 | The NPP is scheduled to perform a roll maneuver (-3.3826 deg) on January 22nd
for VIIRS lunar calibration in orbit 6414 with VIIRS sector rotation (encoder offset) to allow the Moon image to be captured in the Earth view sector (target time 12:13:35z).
During the sector rotation, the VIIRS calibrators and Earth view sectors data are shifted and the dual gain bands will be set to fixed gain mode at High Gain state. 13 min SDRs/EDRs impacted by this activity: 12:08:05 - 12:21:06z (sector rotation). 12 min geolocation pointing off nadir: 12:08:35 - 12:20:35z (maneuver). |
January Lunar Roll Maneuver-VIIRS Lunar Cal Roll with Sector Rotation and fixed High Gain. 12:08:05 VIIRS Encoder Offset Shift to 26790 (S/C DAS) 12:08:06 VIIRS Gain to Fixed High Gain (S/C DAS) 12:08:35 Maneuver (Roll) to -3.3826 deg attitude, 180 seconds 12:11:35 End maneuver; Start 4 min dwell 12:13:35 Center of Dwell - Targetted roll angle time 12:15:35 Maneuver to Nadir attitude, 300 seconds 12:20:35 End maneuver 12:21:04 VIIRS Encoder Offset back to 0 (S/C DAS) 12:21:06 VIIRS Gain back to Auto Gain (S/C DAS) |
Failed Granules: 12:12 | |
2013-01-15 | 15:18-15:29 | DMU#13 | DMU#13: 15:18:01 - 15:29:54 |
Corrupt L1B geolocation: 15:18 - 15:24 (inclusive) | |||
2012-12-23 | 5990 | 50.9 | 14:55:50 - 15:07:50 | The NPP is scheduled to perform a roll maneuver (-7.7668 deg) on December 23rd for VIIRS lunar calibration in orbit 5990 with VIIRS sector rotation (encoder offset) to allow the Moon image to be captured in the middle of Earth view sector (target time at 15:00:50z).
During the sector rotation, the VIIRS calibrators and Earth view sectors data are shifted and the dual gain bands will be set to fixed gain mode at High Gain state. The SDRs/EDRs impacted by this activity are from 14:55:20 to 15:08:21 (sector rotation). There will be 12 minutes pointing off nadir from 14:55:50 to 15:07:50z (maneuver). |
December Lunar Roll Maneuver-VIIRS Lunar Cal Roll with Sector Rotation and fixed High Gain. 14:55:20 VIIRS Encoder Offset Shift to 26790 (S/C DAS) 14:55:21 VIIRS Gain to Fixed High Gain (S/C DAS) 14:55:50 Maneuver (Roll) to -7.7668 deg attitude, 180 seconds 14:58:50 End maneuver; Start 4 min dwell 15:00:50 Center of Dwell - Targetted roll angle time 15:02:50 Maneuver to Nadir attitude, 300 seconds 15:07:50 End maneuver 15:08:19 VIIRS Encoder Offset back to 0 (S/C DAS) 15:08:21 VIIRS Gain back to Auto Gain (S/C DAS) |
  | |
2012-11-23 | 5569 | 50.74 | 21:13:20 - 21:25:20 | The NPP performed a roll maneuver (-9.4289 deg) on November 23rd for VIIRS lunar calibration in orbit 5569 with VIIRS sector rotation (encoder offset) to allow the Moon image captured in the middle of Earth view sector (target time at 21:18:20z).
During the sector rotation, the VIIRS calibrators and Earth view sectors data are shifted and the dual gain bands are set to fixed gain mode at High Gain state. The SDRs/EDRs impacted by this activity are from 21:12:50 to 21:25:51z (sector rotation). There was 12 minutes pointing off nadir from 21:13:20 to 21:25:20z (maneuver). |
November Lunar Roll Maneuver-VIIRS Lunar Cal Roll with Sector Rotation and fixed High Gain. 21:12:50 VIIRS Encoder Offset Shift to 26790 (S/C DAS) 21:12:51 VIIRS Gain to Fixed High Gain (S/C DAS) 21:13:20 Maneuver (Roll) to -9.4289 deg attitude, 180 seconds 21:16:20 End maneuver; Start 4 min dwell 21:18:20 Center of Dwell - Targetted roll angle time 21:20:20 Maneuver to Nadir attitude, 300 seconds 21:25:20 End maneuver 21:25:49 VIIRS Encoder Offset back to 0 (S/C DAS) 21:25:51 VIIRS Gain back to Auto Gain (S/C DAS) |
||
2012-10-25 | 5149 | 51.02 | 06:53:15 - 07:05:15 | The NPP is scheduled to perform a roll maneuver (-4.0485 deg) on October 25th for VIIRS lunar calibration in orbit 5149 with VIIRS sector rotation (encoder offset) to allow the Moon image to be captured in the middle of Earth view sector (target time at 6:58:15z).
During the sector rotation, the VIIRS calibrators and Earth view sectors data are shifted, and the dual gain bands will be fixed at High Gain state. The SDRs and EDRs impacted by this activity are from 6:52:45 to 7:05:46z (sector rotation). There will be 12 minutes pointing off nadir from 6:53:15 to 7:05:15z. |
October Lunar Roll Maneuver-VIIRS Lunar Cal Roll with Sector Rotation and fixed High Gain. 6:52:45 VIIRS Encoder Offset Shift to 26790 (S/C DAS) 6:52:46 VIIRS Gain to Fixed High Gain (S/C DAS) 6:53:15 Maneuver (Roll) to -4.0485 deg attitude, 180 seconds 6:56:15 End maneuver; Start 4 min dwell 6:58:15 Center of Dwell - Targetted roll angle time 7:00:15 Maneuver to Nadir attitude, 300 seconds 7:05:15 End maneuver 7:05:44 VIIRS Encoder Offset back to 0 (S/C DAS) 7:05:46 VIIRS Gain back to Auto Gain (S/C DAS) |
Failed Granules: 06:54 | |
2012-10-09 | 15:58-16:12 | NPP Drag Make-Up Maneuver (12) | DMU#12: 15:58:01 - 16:12:16z The propulsive burn lasted one second. S/C off-nadir pointing from 15:59:00 - 16:12:30 |
Corrupt L1B geolocation: 15:54 - 16:06 (inclusive) | |||
2012-06-26 | 19:05 - 19:20 | NPP Drag Make-Up Maneuver (11) | DMU#11: 19:05:38n- 19:20:08z |
Corrupt L1B geolocation: 19:06 - 19:18 (inclusive) | |||
2012-05-31 | 3068 | 52.97 | The VIIRS is scheduled to perform sector rotation (encoder offset) on May 31st for lunar observation in orbit 3068 to allow the space view Moon image to be captured in the middle of Earth view sector (target time at 14:47:13z). There will be no roll maneuver this time. | May VIIRS Lunar Cal Sector Rotation and fixed High Gain. 14:44:43 VIIRS Encoder Offset Shift to 26790 (S/C DAS) 14:44:44 VIIRS Gain to Fixed High Gain (S/C DAS) 14:49:42 VIIRS Encoder Offset back to 0 (S/C DAS) 14:49:43 VIIRS Gain back to Auto Gain (S/C DAS) (No Roll needed) |
No Maneuver took place. | ||
2012-05-02 | 2654 | 50.92 | 10:15:06 - 10:27:06 | The NPP is scheduled to perform a roll maneuver on May 2nd for VIIRS lunar calibration in orbit 2654 with VIIRS sector rotation (encoder offset) to allow space view Moon image to be captured in the middle of Earth view sector (target at 10:20:06z).
During the sector rotation, the VIIRS calibrators and Earth view sectors data are shifted, and the dual gain bands will be set to High Gain state. The SDRs and EDRs impacted by this activity are from 10:14:36 to 10:27:37z (sector rotation). The 12 minutes roll maneuver will be from 10:15:06 to 10:27:06z. |
May Lunar Roll Maneuver-VIIRS Lunar Cal Roll with Sector Rotation and fixed High Gain. 10:14:36 VIIRS Encoder Offset Shift to 26790 (S/C DAS) 10:14:37 VIIRS Gain to Fixed High Gain (S/C DAS) 10:15:06 Maneuver (Roll) to -3.2275 deg attitude, 180 seconds 10:18:06 End maneuver; Start 4 min dwell 10:20:06 Center of Dwell - Targetted roll angle time 10:22:06 Maneuver to Nadir attitude, 300 seconds 10:27:06 End maneuver 10:27:35 VIIRS Encoder Offset back to 0 (S/C DAS) 10:27:37 VIIRS Gain back to Auto Gain (S/C DAS) |
Failed Granules: 10:18 | |
2012-04-16 | 13:24 - 13:30 | No reference available 2012-02-22 15:18 to 2012-02-22 15:24 |
Failed Granules: 13:24 | ||||
2012-04-02 | 2235 | 51.24 | 23:00:11 - 23:12:11 | The NPP performed a roll maneuver yesterday (4/2) in orbit 2235 while VIIRS was carrying out a sector rotation (encoder offset) to capture the space view Moon image (center at 23:05:11z) in the middle of Earth view sector. During the sector rotation, the VIIRS calibrators and Earth view sectors data are shifted. The SDRs and EDRs impacted by this activity are from ~22:59z to 23:13z. | April Lunar Roll Maneuver-VIIRS Lunar Cal Roll with Sector Rotation and fixed High Gain. 22:59:41 VIIRS Encoder Offset Shift to 26790 (S/C DAS) 22:59:42 VIIRS Gain to Fixed High Gain (S/C DAS) 23:00:11 Maneuver (Roll) to -3.9893 deg attitude, 180 seconds 23:03:11 End maneuver; Start 4 min dwell 23:05:11 Center of Dwell - Targetted roll angle time 23:07:11 Maneuver to Nadir attitude, 300 seconds 23:12:11 End maneuver 23:12:40 VIIRS Encoder Offset back to 0 (S/C DAS) 23:12:42 VIIRS Gain back to Auto Gain (S/C DAS) |
Failed Granules: 23:00, 23:06 | |
2012-03-03 | 1810 | 23:34:14 - 23:46:44 | The NPP performed a roll maneuver yesterday (3/3) in orbit 1810 while VIIRS was carrying out a sector rotation (encoder offset) activity.
During the sector rotation, the VIIRS calibrators and Earth view sectors data are shifted. The SDRs and EDRs impacted by this activity are from ~23:34z to 23:48z. |
March Lunar Roll Maneuver-VIIRS Lunar Cal Roll with Sector Rotation and fixed High Gain. 23:34:14 VIIRS Encoder Offset Shift to 26790 (VIIRS DAS) 23:34:15 VIIRS Gain to Fixed High Gain (VIIRS DAS) 23:34:44 Maneuver (Roll) to -6.1512 deg attitude, 180 seconds 23:37:44 End maneuver; Start 4 min dwell 23:39:44 Center of Dwell - Targetted roll angle time 23:41:44 Maneuver to Nadir attitude, 300 seconds 23:46:44 End maneuver 23:47:14 VIIRS Encoder Offset back to 0 (VIIRS DAS) 23:47:15 VIIRS Gain back to Auto Gain (VIIRS DAS) NOTE: March Moon image was not captured due to an error in the lunar roll prediction table. |
Failed Granules: 23:36 | ||
2012-02-22 | 15:18 - 15:24 | VIIRS Sector Rotation Complete | No reference available 2012-02-22 15:18 to 2012-02-22 15:24 |
Failed Granules: 15:18 | |||
2012-02-20 | 18:24- 18:48 | NPP S/C Pitch Maneuver | NPP S/C Pitch Maneuver |
Failed Granules: 18:24, 18:30, 18:36, 18:42 | |||
2012-02-17 | 2012-02-17 no ref 2012-02-17 no ref | 1 pitch slew slew only; NOAA site does not report event, no data gaps |
|||||
2012-02-16 | 2012-02-16 no ref 2012-02-16 no ref | VIIRS 14 SD yaw cal, +1 pitch slew slew only; NOAA site does not report event, no data gaps |
|||||
2012-02-15 | 2012-02-15 13:37 to 2012-02-16 13:36 | NPP Yaw Maneuvers for OMPS/VIIRS Maneuvers were conducted on 15 consecutive orbits slew only |
|||||
2012-02-10 | 2012-02-10 20:53 to 2012-02-11 08:49 | NPP Attitude Maneuver | NPP Attitude Maneuver: MN015375 no signature in geolocation team review, Attitude nominal |
||||
2012-02-03 | 1388 | 55.38 | 5:58:34 - 6:10:34 | Roll Maneuver for VIIRS Lunar Calibration | VIIRS Lunar Cal #8a - #2 5:58:34 Maneuver (roll) to -5.2794 deg attitude, 180 seconds 6:01:34 End maneuver; start 4 min dwell 6:03:34 Center of Dwell - Targeted roll angle time 6:05:34 Maneuver to Nadir attitude 6:10:34 End Maneuver |
||
2012-02-03 | 1387 | 56.19 | 4:16:32 - 4:28:32 | Roll Maneuver for VIIRS Lunar Calibration | VIIRS Lunar Cal #8a - #1 4:16:32 Maneuver (roll) to -5.4452 deg attitude, 180 seconds 4:19:32 End maneuver; start 4 min dwell 4:21:32 Center of Dwell - Targeted roll angle time 4:23:32 Maneuver to Nadir attitude 4:28:32 End Maneuver |
||
2012-01-30 | 18:48:37-19:01:57 | NPP Collision Avoidance Maneuver | NPP Collision Avoidance Maneuver RMM#1?: 18:48:37-19:01:57 |
Corrupt L1B geolocation: 18:48 - 19:00 (inclusive) | |||
2012-01-17 | 19:33:06-19:46:21 | Station-Keeping Maneuver | Station-Keeping Maneuver (DMU): 19:33:06-19:46:21 |
Corrupt L1B geolocation: 19:30-19:42 (inclusive). | |||
2012-01-12 | 12:03:23-12:34:19 | Roll Maneuver for ATMS Calibration | Roll Maneuver for ATMS Calibration: Roll slew: 12:03:23 --12:34:19 |
Failed Granules: 12:06, 12:12, 12:18, 12:24, 12:30 | |||
2012-01-12 | 13:49:53-14:11:50 | Roll Maneuver for ATMS Calibration | Roll Maneuver for ATMS Calibration slew: 13:49:53-14:11:50; slew only |
Failed Granules: 13:48, 13:54, 14:00 | |||
2012-01-04 | 964 | 55.41 | 8:43:53 - 8:55:53 | Roll Maneuver for VIIRS Lunar Calibration | January Lunar Roll Maneuver 8:43:53 Maneuver (Roll) to -9.488 deg attitude, 180 seconds 8:46:53 End maneuver; Start 4 min dwell 8:48:53 Center of Dwell - Targetted roll angle time 8:50:53 Maneuver to Nadir attitude, 300 seconds 8:55:53 End maneuver |
To be investigated |