Opening Date:
2023-06-21
Last update:
2023-06-21
Status:
Note
The LandSIPS has started the MODIS Collection 6.2 (C6.2) Land reprocessing of DSR/PAR (MCD18*). The reprocessing will cover the mission period from year 2000 to the end of 2004, followed by a second reprocessing stream covering mission period from the beginning of 2005 to the leading edge. The C6.2 carries the latest changes to DSR/PAR (PGE141) that makes use of the TOA reflectance from the three bands (band 3, 5, and 7), compared to only Band 3 in the current C6.1 version. Please refer to the C6.2 specific changes in the updated user guide here.
Occurrence:
Terra MODIS C62 L1B and downstream products for specified date and time periods.
PGE:
All
Case Name:
HC_MCD18_23165